Consultancy Services for Authority’s Engineer for Upgradation to Two Lane with Paved Shoulders Configuration for the Section (I) Patgaon – Khopoli Section I [Design Ch. Km 48+783 to 69+508] and Section (II) Patgaon – Khopoli Section II [Design Ch. Km 69+508 to 91+139] of NH-548A (Part Shahapur-Murbad-Karjat-Khopoli) in the State of Maharashtra on EPC Mode. AE-2018/Mum/02
Project Details
- Sector:Roads
- Client:MSRDC
- Location:Maharashtra Pac-II
- State:Maharashtra, India
- Status:ongoing